Projects
Selected project experience
A cross-section of recent work, from a ten-day skid to a ten-month effluent treatment plant. Client names are withheld under confidentiality; each sheet shows the plant, its capacity, our scope and how long it took.
-
Distillery
Distillery Plant
- Capacity
- 120 KLPD ENA
- Duration
- 5 months
- Lines modelled
- 1,300
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Water & Wastewater
Effluent Treatment Plant
- Capacity
- 14 MLD
- Duration
- 10 months
- Lines modelled
- 1,200
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Edible Oil
Sunflower Oil Refinery
- Capacity
- 200 TPD
- Duration
- 4 months
- Lines modelled
- 550
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Water & Wastewater
Sewage Treatment Plant
- Capacity
- 450 KLD
- Duration
- 3 months
- Lines modelled
- 450
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Chemical
HCl Synthesis Unit
- Capacity
- —
- Duration
- 3 months
- Lines modelled
- 330
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Water & Wastewater
Water Treatment Plant
- Capacity
- 350 KLD
- Duration
- 1 month
- Lines modelled
- 300
3D modeling
- Piping
- Pipe supports
- Structure
- Equipment
- Cable trays
2D drafting
- Piping GA
- Equipment layout
- Orientation mark-ups
Coordination
- Project coordination
-
Water & Wastewater
RO Block Skid
- Capacity
- —
- Duration
- 10 days
- Lines modelled
- —
3D modeling
- Liftable skid frame
- Pressure tubes
- High-pressure pump
- All RO lines
- CIP lines
2D drafting
- Skid GA
- Skid fabrication drawings
- Orientation mark-ups
- Isometric drawings
-
50+
These seven are a cross-section of more than 50 projects delivered since 2019 across water, edible oil, distillery and chemical plants.
Discuss your project
Tell us about your project
Send us your P&ID, GA or scope and we will come back with how we would approach it.