Projects

Selected project experience

A cross-section of recent work, from a ten-day skid to a ten-month effluent treatment plant. Client names are withheld under confidentiality; each sheet shows the plant, its capacity, our scope and how long it took.

  • Distillery

    Distillery Plant

    Capacity
    120 KLPD ENA
    Duration
    5 months
    Lines modelled
    1,300

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Water & Wastewater

    Effluent Treatment Plant

    Capacity
    14 MLD
    Duration
    10 months
    Lines modelled
    1,200

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Edible Oil

    Sunflower Oil Refinery

    Capacity
    200 TPD
    Duration
    4 months
    Lines modelled
    550

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Water & Wastewater

    Sewage Treatment Plant

    Capacity
    450 KLD
    Duration
    3 months
    Lines modelled
    450

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Chemical

    HCl Synthesis Unit

    Capacity
    —
    Duration
    3 months
    Lines modelled
    330

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Water & Wastewater

    Water Treatment Plant

    Capacity
    350 KLD
    Duration
    1 month
    Lines modelled
    300

    3D modeling

    • Piping
    • Pipe supports
    • Structure
    • Equipment
    • Cable trays

    2D drafting

    • Piping GA
    • Equipment layout
    • Orientation mark-ups

    Coordination

    • Project coordination
  • Water & Wastewater

    RO Block Skid

    Capacity
    —
    Duration
    10 days
    Lines modelled
    —

    3D modeling

    • Liftable skid frame
    • Pressure tubes
    • High-pressure pump
    • All RO lines
    • CIP lines

    2D drafting

    • Skid GA
    • Skid fabrication drawings
    • Orientation mark-ups
    • Isometric drawings
  • 50+

    These seven are a cross-section of more than 50 projects delivered since 2019 across water, edible oil, distillery and chemical plants.

    Discuss your project

Tell us about your project

Send us your P&ID, GA or scope and we will come back with how we would approach it.